For the cladding of the new Trittkopfbahn gondola lift we installed work scaffolding composed of the Layher SpeedyScaf and Layher Allround scaffolding.
New build of the Zugspitze mountain station - Garmisch Partenkirchen (D)
For the new build of the Zugspitze mountain station we erected work scaffolding for the construction of the steel structure and for the installation of the glass facades.
Bridge renovation A12 - Wilten / Innsbruck (TIR)
For the renovation of the motorway bridge sections along the A12 near Wilten (Innsbruck) we built a suspended scaffold with a work platform.
Castle renovation - Heinfels (TIR)
For renovation work on the outer facade and the castle tower we erected work scaffolding using the Layher SpeedyScaf system.
Special scaffold with event system - Dorf Tirol (I)
For the 2019 Summer Festival in Dorf Tirol (South Tyrol) we installed a seated grandstand with bucket seats.